Seawall construction begins in Mission Beach
Tear down the sea wall! The old crumbling mission beach boardwalk sea wall is finally getting its over due and long awaited makeover.
Construction started after summer of 2015 at staring at the north side of Belmont park all the way down to the Draft restaurant. A fence blocks off half of the boardwalk creating a tighter space for pedestrians and bicycles. A sign encourages people to walk their bikes.
The repairs will continue to move south into the mission beach park where the wall and the road are both getting the new treatment.
At its current speed one can expect the construction to last a couple of years, the foundation of the wall goes down as far as 10 feet underground in some areas. That is a lot of sand to dig up.
February 2016